Have you had a building addition?
Have you replaced a panel or added any new equipment?
WE PERFORM ARC FLASH STUDIES AS REQUIRED BY THE NEC 2026 CODE CHANGE!
When working on electrical applications, it is crucial to know the potential hazards involved. An Arc Flash Hazard Analysis can be conducted on electrical equipment to identify the degree of hazard involved. It also provides information regarding additional protective measures and recommendations that may need to be taken in order to bring your equipment into compliance. And NO outage required!
The NFPA 70E (National Fire Protection Association) standard requires that buildings and facilities update their Arc Flash Hazard Analysis every five (5) years or after any significant equipment/system changes. We recommend that all buildings and facilities check their electrical equipment for Arc Flash Hazard labels. If the labels are out of date, or you have not had an Arc Flash Hazard Analysis conducted, please contact us to perform your Arc Flash Hazard analysis to bring your facility into compliance with NFPA 70E.
Contact us for more information on how we conduct Arc Flash Studies.
